Zoning
FAQ
When do I need a Zoning Permit?
A Zoning Permit is required whenever a property owner is increasing
the square footage of the principal building or any detached
building. All additions shall conform to the setbacks and building
envelopes of the Township Zoning Resolution.
Do I need a zoning permit for an accessory building [storage
shed]
Yes, It is the property owner’s responsibility to locate the
accessory building consistent with the required zoning setbacks You
will need a building permit if the accessory building exceeds 192
square feet [12’ x 16’]
Do I need a zoning permit for a fence?
Yes. All fences shall conform with the Township Zoning Resolution
Do I need a zoning permit for a swimming pool?
Yes. All pools above ground and in ground require a zoning permit
What about street, yard, craft and garage sale signs?
Ohio law and Brimfield Township zoning prohibits posting of signage
on utility poles and in road right of ways.
As a courtesy the Township allows posting of signage 72 hours prior
to the sale. All signage must be removed within 24 hours after the
sale Failure to comply will result in a citation being issued.
Please honor this courtesy.
No signage is allowed in any road construction area.
Last modified:
October 14, 2009